Multi-Day AV Crew Schedule Template
Plan load-in, rehearsal, show and strike as separate shifts with a worked example and handoff checklist.
Updated October 22, 2026 · Illustrative templates
One event can contain several different calls
A multi-day AV schedule should show what each person is assigned to do on each day. A single event date range is not enough when load-in, rehearsal, show coverage and strike use different departments or call times. Keep planned windows separate from actual worked hours.
Worked planning example
| Day / phase | Role | Planned window | Check before booking |
|---|---|---|---|
| Day 1 / load-in | Audio and video install crew | 08:00–18:00 venue local | Dock access, lead, assigned tasks |
| Day 2 / rehearsal | Operators and support | 10:00–19:00 venue local | Rehearsal changes and handover |
| Day 3 / show | Main-room and breakout coverage | 07:00–17:00 venue local | Staggered starts and relief coverage |
| Day 3 / strike | Strike crew | 17:00–22:00 venue local | Separate confirmation and safe staffing review |
Do not book the table blindly
These are illustrative planning windows, not recommended shift lengths or staffing levels. Review venue requirements, breaks, safe working arrangements, travel and applicable agreements with the responsible production team. A worker confirmed for show operation is not automatically confirmed for the strike.
Keep a person-by-day matrix
- Put each person’s name, role and lead against the specific day.
- Record acceptance for the actual assignment window.
- Check overlaps with other productions and travel; do not assume software caught them.
- Give replacements a handover owner and a current brief.
- Use an explicit next-day end date for overnight work.
At the end of each day
Record actual start/end information, worked hours and approved corrections while details are fresh. If the planned ten-hour day became eight hours, preserve the actual work record and apply the agreed pay terms separately. In Callsheet Live, multi-day jobs can contain separate shifts and rates; the schedule is not evidence that those hours were worked.